MikroTik office building in Riga, Latvia

Mikro Tik Office Riga_ext

2019-08-23

A six storey office building has been completed in 2019

An office buiding in Riga, Latvia has been completed. The building is using TermoDeck for heating, cooling and ventilation.
The buildings has six floors and a total area of 6000 m2. On the ground floor there is a restarant.
The design is flexible and has taken into account potential layout changes in the future.
TermoDeck has been installed in co-operation with our partner Consolis.
Consolis has designed and erected the building frame including load bearing walls, windows, hollow core slabs on all floors.
Under the building there is a parking.

TermoDeck® System

TermoDeck differs from other energy saving systems because the overall construction cost is lower than conventional buildings as no extra equipment is added.

Thermal energy storage

Thermal energy storage (TES) systems can heavily reduce the installed cooling loads and peak power loads.

Energy efficient buildings

 TermoDeck® Buildings fulfill high requirements from an energy, enviromental and thermal comfort perspective.

Cost-efficient buildings

Independent reports have been carried out comparing capital costs of TermoDeck and conventional HVAC systems.